Boker · Code 01SC080

Magnum Long Lead EDC Folding Knife

★★★★★ 4,8 147 reviews Heureka verified
Folding knife with safety mechanism and clip.
Knives Folding knives

Detailed product description

Magnum Long Lead EDC Folding Knife.

The Magnum Long Lead EDC is a classic gentleman’s and gourmet pocket knife for everyday use that immediately impresses with its simple, slightly curved design. The straightforward design is matched by the technical construction as a knife with a straight profile, which has proven itself millions of times thanks to its simple operation and lower number of components. The satin-finished blade made of 8Cr13MoV stainless steel features a flat grind, opens with a nail nick, and does not lock. The slightly contoured handle scales made of textured G10 sit comfortably in the hand. With clip (tip-down / right).

Opening: Manual

Lock: Slipjoint

Color: Black

Blade color: Uncoated

Key parameters

Overall length cca 7.24" (18,4 cm)
Blade length cca 3.15" (8 cm)
Weight cca 2.75 oz (~ 78 g)
Steel 8Cr13MoV
Handle G10
Blade thickness cca 0.11" (2,7 mm)

Customer reviews

All 147 reviews →
4,8
★★★★★
147 reviews · Heureka verified
5129
414
33
21
10

You may also like

More →